Construction Specs.

 

Wood for Main Box Construction

Top/Floor

L-32" W-20"

Quan.- 2 per unit x 9 units = 18 total

Materials- 3 sheets – 4x8 plywood

Side

L-32" H-23"

Quan.- 2 per unit x 9 units = 18 total

Materials- 3 sheets – 4x8 plywood

Back

W-20" H- 23"

Quan.- 1 per unit x 9 units = 9 total

Materials- 2 sheets – 4x8 plywood

Front

Doors for Cages

Frame panel (2 lengths of 16" and 2 of 20")

H-23" W-16"

Quan.- 1 set per unit x 6 units = 6 total

Materials- 26ft of 1"x2" plank

Dowels

D-1/4" H-20"

Quan.- 10 per unit x 6 units = 60 total

Materials- 100ft of 1/4" dowel

Doors for Cabinets

W-16" H-23"

Quan.- 1 per unit x 3 units = 3 total

Materials- scrap from 2nd sheet of back

Door Frames

W-2" H-23"

Quan.- 2 per unit x 9 units = 18 total

Materials- scrap from floors

Braces, Supports, and Hardware

Underside Supports and Top Braces

Running side to side

L-2" W-20" H-1"

Quan.- 4 per unit x 9 units = 36 total

Materials- 60ft of plank

Running front to back

L-32" W-2" H-1"

Quan.- 2 per unit x 9 units = 18 total

Materials- 48ft of plank

Triangle wedges- front to back

L-31" W-1"

Quan.- 4 per unit x 9 units = 36 total

Materials- 46.5ft of 1"x1" board

Total Lumber

8 sheets 1/2 in plywood

210ft of 1x2 plank

100 ft of 1/4" dowel rods

Hardware

Hinges

Quan.- 2 per unit x 9 units = 18 total

Door latches

Quan.- 1 per unit x 9 units = 9 total

Castors

Quan.- 4 per unit x 3 units = 12 total

Handles

Quan.- 2 per unit x 9 units = 18 total

Formica

Eight sheets , cut to match insides of floor, sides, back, front, and top.

Contact Cement

1 & 1/2 gallons

 

 

 

Serpent Mage Home | Project Main | Workbook | Index